Wheeewww! It's finally done. We started our hoophouse in the middle of Winter, excavating the drainage trenches. We then spent most of Spring dumping ton after ton after ton of gravel into the trenches. After a road trip to Missouri, we returned with a trailer full of metal framing. It took over a month to pound posts into the ground, build arches and lift them into place, and attach bracing. Once the metalwork was complete, we constructed the endwalls with lumber. And finally in the last few weeks we attached all the plastic, with the help of our friends! Check out more of our pics on Facebook!
1 Comment
|
Welcome!We are Four Flags Farm, Armonda & Ben Riggs! Archives
February 2022
Categories |